For manufacturers who plan labour line by line, across one plant or an estate.

Operations directors see the hours and the agency spend, planners size the order, and supervisors know who to move and when.

One plan, read at three levels.

Operations directors

Standard against actual hours, overrun, agency spend and how often managers follow the plan, by week and by area.

  • Each plant on its own, or the estate together
  • The plan by day, site, area and hour, fed to Power BI

Labour planners

The heads each area needs every quarter hour against the team on shift, and the agency order sized to the gap.

  • The same forecast always gives the same plan
  • One switch compares it with the plan where nobody moves

Shift supervisors

The moves to call in time order: who goes from which line to which, with cross-site moves marked.

  • Moves only between areas a person is trained for
  • Skills gaps visible before they become an agency bill

What Outlay Labour needs to start.

  1. 01Forecast volumes

    What each area has to handle, day by day.

  2. 02Standards and efficiency

    Standard minutes for each task, and the efficiency each area achieves.

  3. 03Your colleagues and their skills

    Who works where, and who is trained for what. Libra maps your existing data to these tables.

See your own forecast as a labour plan.

Talk to Libra about turning your forecast, standards and skills matrix into the heads each hour needs and the agency you actually have to order.

Talk to Libra about Outlay Labour

Tell us how you plan labour today, and we will walk you through the product.