What planners ask before they trust a schedule they did not build.

About the ERP, optimal plans, incomplete data, real margin and breakdowns.

Questions planners ask before they trust it.

Does Outlay replace our ERP?
No. It sits alongside it. Master data comes in from your existing systems or a spreadsheet, and Outlay adds what an ERP does not do live: finite-capacity scheduling with labour, line capture and costing against standard as the shift runs.
Is the schedule optimal?
Outlay produces feasible plans that keep every hard constraint you give it. It does not claim a mathematically optimal schedule, and the planner stays in charge of the trade-offs.
Our master data is incomplete. Can we still start?
Yes. Each record shows where it came from and which fields are absent, and a schedule that depends on an unconfirmed time, rate or feed shows it as a blocker rather than inventing a number.
Is the margin real or estimated?
Both, and labelled. Where the floor has captured readings, cost and margin come from them. Where a run has no readings yet, Outlay shows a modelled projection and says so on the card.
What happens when a line breaks down?
Outlay drafts a recovery plan. Work that has started, completed or been locked stays protected, and a planner reviews and approves the changes before release.
Who sets it up?
Libra configures Outlay for each manufacturer from your own lines, products, routings, crews and cost standards. It is the same product for every plant, with your data loaded.

See your own plant scheduled in Outlay.

Talk to Libra about loading your master data and generating a schedule against the machines, people and standards you actually have.

Talk to Libra about Outlay

Tell us how you plan today, and we will show you the product and what it would need from you.