For manufacturers who plan against real machines and real crews.

Planners keep the trade-offs, the floor keeps the schedule honest, and finance sees margin against standard as it happens.

Planners, the floor and finance, working from one schedule.

Planners

Check the data, generate the schedule in one action and stay in charge of the trade-offs.

  • Hard rules for changeovers, allergens and material feeds
  • Recovery plans to review and approve when a line goes down

Production and shift managers

Plan and actual side by side on one Gantt, with any run lighting up the chain it depends on and the work it feeds.

  • A slow line shows while the shift can still recover it
  • Crew needed run by run, against the staffing on hand

Operations and finance

Planned against projected margin by site and operation, with the biggest opportunity named.

  • Cost from captured readings where the floor has them
  • Modelled projections labelled as such on the card

What Outlay needs to start.

  1. 01Items, recipes and routes

    From your existing systems or a spreadsheet, each record showing where it came from and what is missing.

  2. 02Resources, crews and skills

    The machines and qualified labour the schedule is planned against.

  3. 03Demand

    What has to be made, and by when.

  4. 04Cost standards

    The standard every run is costed against as the floor reports in.

See your own plant scheduled in Outlay.

Talk to Libra about loading your master data and generating a schedule against the machines, people and standards you actually have.

Talk to Libra about Outlay

Tell us how you plan today, and we will show you the product and what it would need from you.