Scheduling, the cockpit and live costing on one model of the plant.
Finite machine time and qualified labour, plan beside actual on one Gantt, and margin against standard while the shift is still going.
The rest of the plant, on the same model.
Crew needed, run by run
Each block is one production run, as tall as its crew and as long as it runs, stacked by area against the staffing you have, so a shortage shows before the shift.

Every table the plan needs
Pick what you will use Outlay for and the setup shows the tables that takes, how they depend on each other, and which are already filled.

Margin by site and operation, live
Planned against projected margin, schedule, scrap, downtime and crew for the whole estate, with the biggest opportunity named and a list of where to look first.

A slow oven shows up in the cockpit while the shift still has time to recover it.
One Outlay model of work, people and cost, in three products.
One Outlay model of work, people and cost, in three products: Outlay schedules a factory, Outlay Labour plans its labour hour by hour, and Outlay 3PL plans and runs a warehouse's shifts.
Outlay
Production scheduling
Turns demand and master data into a production schedule planned against real machine and labour capacity, then costs every run live against standard.
You are on the Outlay site
Outlay Labour
Labour planning by the hour
Turns forecast volumes into the heads each area needs through the day and sets them against the team on shift, so agency covers only what is left.
Visit the Outlay Labour siteOutlay 3PL
Warehouse shift planning
Turns the waves your WMS releases and the team on shift into a labour plan for every shift of the week, and shows the shift live on a map of the site.
Visit the Outlay 3PL site
See your own plant scheduled in Outlay.
Talk to Libra about loading your master data and generating a schedule against the machines, people and standards you actually have.
Talk to Libra about Outlay
Tell us how you plan today, and we will show you the product and what it would need from you.