The planner checks the data, and Outlay builds and costs the schedule.

Outlay does the arithmetic of who and what can run where, and when, then re-costs each run from the floor.

From reviewed data to a schedule in one action.

The planner checks the data. Outlay does the arithmetic of who and what can run where, and when.

  1. 1

    Load demand and master data

    Items, recipes, routes, resources and demand come in from your systems or a spreadsheet, each record showing its source and what is missing.

  2. 2

    Generate the schedule

    Outlay plans every operation against finite machine time and qualified labour, with changeovers, allergens and material feeds as hard rules.

  3. 3

    Run it in the cockpit

    Plan and actual sit side by side on one Gantt, and any run lights up the chain it depends on and the work it feeds.

  4. 4

    Let the floor re-cost it

    Each reading from the line re-derives the run's projected cost and margin against standard while the shift is still going.

A day's schedule, built and then rebuilt.

Cockpit · Thursday
On plan
06:0008:0010:0012:0014:0016:0018:00Mixer 1Mixer 2Oven 1Oven 2EnroberPack 1Pack 2WO-101WO-104WO-107WO-110WO-102WO-105WO-108WO-101WO-104WO-107WO-102WO-105WO-108WO-101WO-104WO-105WO-101WO-105WO-102WO-104WO-108Down until 12:3006:00MARGIN AGAINST STANDARD£0RUNS RE-TIMED0

Step 1 of 4: Runs drop into their lines.

Each work order takes the first slot where its machine, its crew and the run feeding it are ready.

See your own plant scheduled in Outlay.

Talk to Libra about loading your master data and generating a schedule against the machines, people and standards you actually have.

Talk to Libra about Outlay

Tell us how you plan today, and we will show you the product and what it would need from you.